Collie Battery

battery-energy

Project Type:

Storage

energy-power

Project Phase:

Operational

location

Region:

South West

Overview

Collie Battery

0 MW

Total power capacity

0 MWh

Energy storage capacity

0,000

Total project area

0,000

Homes powered with cleaner, smarter energy

What’s happening in Collie?


For decades, Collie has been the beating heart of the South West Interconnected System (SWIS). Neoen's Collie Battery project reaffirms this historic role, supporting the region's evolution into a world-leading energy storage hub. Delivered over two stages, it works by storing excess energy generated during the day and discharging it when the community needs it most. The project is one of the largest batteries by storage capacity in the entire country. Utilising cutting-edge Tesla Megapack technology, the battery can charge and discharge approximately 20% of the average demand on the SWIS. The project is connected to the Western Power network at the Palmer Terminal substation via a dedicated 330 Kilovolt switchyard.

location

Location

Just 13km northeast of Collie, the project sits at the heart of WA's main electricity system. This location was chosen to take advantage of existing transmission infrastructure and clear, open space - allowing the delivery of a world-class storage hub in Collie that respects the local landscape while strengthening our State’s main electricity grid.

community

Community benefits

This project has had a positive impact on the local community: it delivered hundreds of jobs during its construction and continues to support a handful of full-time roles now it is operational. Furthermore, Neoen has implemented a Community Benefit-Sharing Scheme for the lifetime of the project and launched an educational Learning Hub to provide local schools with resources on renewable energy.

checks-approvals

Project Status

The project is fully operational. Stage 1 commenced operations in October 2024, with Stage 2 coming online a year later.

renewable-energy

Powering Western Australia for decades

The Collie Battery will have an operational life of around 20 years.

Want to know more?

Check out more information on the Collie Battery on Neoen's dedicated project website.

For general information on how long it takes to create renewable projects, check out our dedicated learn section.